Index

PF2

Head

Frameworks

Adoption

Overview
Mapping

PEFF

Head

Adoption

Adoption
Overview
Detail

Guidance

Iterations

Single
Over Time

Measures

Maturity Model

PTMC

Levels
Tools
Example Report
Step 0
The First Step is NOT the Hardest
Actions

Measures PTMC

Level 0

Motivation

Paradigm Shift
WE Deming
70 of All Change Initiatives Fail
Enterprise Viability
Sage Words
Basic Premise
The Transformation of Transformation
What Your Transformation Capability Looks Like
Building the Machine that Makes the Machine
Culture

Demotivation

Dont Throw The Baby Out With The Bathwater
Domain Blindness
The Red Pill
Timing Paradox
Management Workers Paradox
Process Paradox
Unconscious Degradation
False Accomplishment
Oversimplification
Reality Avoidance
Its Just Not Sexy
The Drowning Children
Step 1
Actions

Measures PTMC

Level 1
Step 2
Actions

Measures PTMC

Level 2
Step 3
Actions

Measures PTMC

Level 3

PEAF

Head

Adoption

Adoption
Step 4
Actions
Risks
Step 5
Actions
Setup EA Governance
Prepare Process Change
Define the EA Meta model
Prepare EA Education
Prepare Culture Change
Select an EA Modelling Tool
Step 6
Actions
Rollout Process Change

Actions

Setup the EA Meta model
Provide EA Education
Rollout Culture Change
Rollout EA Modelling Tool

Culture

Culture

Enterprise Architect

Two Types

Type 1

Requirements
Duties
       
Click a Thumbnail to read the component. Hold down Ctrl while clicking to expand the image

 

1. Adopt EA - Setup or Mature an EA Function






PEFF>Adoption>Step-3>Actions ◄◄◄           .           ►►► PEAF>Head

Here we show the PTMC Level 3 which is used to perform a very high level, structured, evaluation of your Enterprise's Transformation capability.

Pragmatic  EC  would be happy to help you perform an assessment, and here we show an example of the output of an assessment.

 ...to read more, please Login or Register

PEFF>Adoption>Step-3>Actions ◄◄◄         Enroll to Self Study Now!         ►►► PEAF>Head

Keypoint

Adopt this component by...

Use PTMC Level 3 to narrow down specific areas that need some TLC.

EA Project Team: Instigate an initiative to use the Level 3 PTMC to perform a detailed assessment of the Enterprise's Transformation Capability.

Questions to ponder...

Do you think the Level 3 PTMC is a good way to get a detailed view of the maturity of your Transformation capability?

If not, why not? What would you change?

What measures does your Enterprise use to do a detailed assessment its Transformation Capability?

If it doesn’t have any, what problems does this create?

Who is Accountable in your Enterprise for setting these Measures?

How would your Enterprise fair if you Assessed it?







© 2008-2021 Pragmatic 365 Ltd         A Non-Profit dedicated to improving Transformation, and the lives of people that work in Transformation.