Index

PEFF

Adoption

Overview
Detail

Measures

Maturity Model

PTMC

Levels
Tools
Example Report

Step 0

Measures PTMC

Level 0
Step 1
Actions

Measures PTMC

Level 1
Step 2
Actions

Measures PTMC

Level 2
Step 3
Actions

Measures PTMC

Level 3
       
Click a Thumbnail to read the component. Hold down Ctrl while clicking to expand the image

 

- PB-EVALUATE


PEFF>Adoption>Step-2 ◄◄◄           .           ►►► PEFF>Adoption>Step-2>Measures-PTMC>Level-2

Here we see the basic structure for the information and process for an Adoption step.

Inputs

On the left is the input. Measures, which drove the Assessment (against those measures), which created the Motivation, to perform the Actions of this step. For all steps (Except Step 1) the input on the left comes from the previous step. For Step 1, the input on the left comes from outside the Enterprise (the Enterprise's Context).

 ...to read more, please Login or Register

PEFF>Adoption>Step-2 ◄◄◄         Enroll to Self Study Now!         ►►► PEFF>Adoption>Step-2>Measures-PTMC>Level-2

Keypoint

Adopt this component by...

The PTMC is key to being able to Pragmatically assess your Transformation Capability.

EA Project Team: Follow the 2nd step in PEFF for maturing your Transformation capability.

© 2008-2021 Pragmatic 365 Ltd         A Non-Profit dedicated to improving Transformation, and the lives of people that work in Transformation.