Index

PF2

Introduction

Introduction

Companies

Overview

Training

Certification Courses
Focused Workshops
Options

Pragmatic Publishing Platform

Overview
Design

Frameworks

Frameworks

Overview

X Frameworks
Applicability

Available Now

PEFF Enterprise Fundamentals
Why Use It
POET Enterprise Transformation
Why Use It
Operating Model
PEAF Enterprise Architecture
Why Use It
Logical Model
PTMC Transformation Maturity
Why Use It
Logical Model

PEFF

Head

Language

Language

Basics

I Didnt Mean What You Heard
What is a System
What is an Enterprise
What is Transformation

Ontologies

Ontologies

Structural

MAGIC

Transformational

MAGMA

Enterprise

DOTS

Adoption

Adoption
Overview

Measures

PTMC

Levels
Tools
Step 0

Measures PTMC

Level 0

Motivation

Paradigm Shift
WE Deming
70 of All Change Initiatives Fail
Enterprise Viability
Sage Words
Basic Premise
The Transformation of Transformation
What Your Transformation Capability Looks Like
Building the Machine that Makes the Machine
Culture

Demotivation

Dont Throw The Baby Out With The Bathwater
Domain Blindness
The Red Pill
Timing Paradox
Management Workers Paradox
Process Paradox
Unconscious Degradation
False Accomplishment
Oversimplification
Reality Avoidance
Its Just Not Sexy
The Drowning Children
Step 1

Measures PTMC

Level 1
Step 2
Level 2
Step 3
Level 3

POET

Head

Adoption

Adoption
Step 4
Step 5
Step 6

Methods

Methods

Phases

Resource Utilisation

Solutioning

A Pragmatic Approach
Pattern

Disciplines

Overview
Capability Model

Governance and Lobbying

Technical Debt vs Transformation Debt

Transformation Debt

Investment Profiles

Artefacts

Artefacts

Ontology

Basics

Mapping to Phases

Detail

Structural and Transformational Zachman
Models

Meta models

Hybrid

Items

Architecture and Engineering

Architect Horizontally Engineer Vertically

Culture

Culture

Organisation Structure

Management
Workers

Architects and Engineers

Comparison

PEAF

Head

Adoption

Adoption
Step 4
Risks
Step 5
Step 6

Methods

Methods

Phases

Strategising

Capability Modelling

With DOTS

Roadmapping

Create update Portfolio Model

Artefacts

Artefacts

Ontology

Meta models

Models

Relationships

Guidance

Guidance

Principles

Types

WHAT We Produce
HOW We Do Transformation

PF2

Appendix

Appendix

Background

The Author
       
Click a Thumbnail to read the component. Hold down Ctrl while clicking to expand the image

 

Intro - An Introduction to Pragmatics Frameworks












PEFF>Adoption>Step-0>Demotivation>False-Accomplishment ◄◄◄           .           ►►► PEFF>Adoption>Step-0>Demotivation>Reality-Avoidance

The Oversimplification barrier to getting an Enterprise to mature its Transformation capability is that many Enterprises have a compulsion to reduce things to the point of uselessness.

In general (in the Transformation Capability), people have the drive to want to do the absolute minimum. And that basic feeling is cultured by Management’s insatiable appetite for quick wins and low hanging fruit. That’s not necessarily a bad thing. Architects do it all the time - reducing things to the simplest and most fundamentally important parts. The problem is, when you reduce things to the minimum and still people ask, “Hmmm - OK - I understand, but can’t we just do something smaller?”

 ...to read more, please Login or Register

PEFF>Adoption>Step-0>Demotivation>False-Accomplishment ◄◄◄         Enroll to Self Study Now!         ►►► PEFF>Adoption>Step-0>Demotivation>Reality-Avoidance

Keypoint

Adopt this component by...

Oversimplification:

Many Enterprises have a compulsion to reduce things to the point of uselessness.

Management: Don't dilute POET/PEAF to the point of uselessness.

Questions to ponder...

What is the minimum your Enterprise will adopt?

Do you want to adopt something smaller than that?”























© 2008-2021 Pragmatic 365 Ltd         A Non-Profit dedicated to improving Transformation, and the lives of people that work in Transformation.